info@tadbirpoyan.com

Free Call

24 Call Us Now 24/7 Customer Support

Our Location

Canada Office Address: 6365 Yonge Street, Toronto ON, M2M 3X8, Canada

Sidewalk construction of Alborz street

  • 12/22/2021 5:00:20 PM
  • no comment
  • 2 minutes
  • 406

Tadbir Pouyan Asr Technical and Engineering Company, due to its high history in the field of sidewalk construction, as well as the reconstruction and maintenance of such urban spaces; It is possible to perform such activities with the highest quality and at the right time with the best experienced personnel.

Sidewalk construction of Alborz street

Project name: Alborz street sidewalk construction

Location: Marzdaran area, 10th Alborz street

Date: Summer 98

Subject: Maintenance and reconstruction of roads in District 4 of Tehran Municipality, District 2

Tadbir Pouyan Asr Technical and Engineering Company, due to its high history in the field of sidewalk construction, as well as the reconstruction and maintenance of such urban spaces; It is possible to perform such activities with the highest quality and at the right time with the best experienced personnel. Due to this capability, the municipality of Region 2 invited the company to repair sidewalks and tables in this region, so that with the budget provided in 1998, this important issue could reach the implementation stage.

Finally, a contract was signed between District 4 of District 2 Municipality and Tadbir Poyan Asr Technical and Engineering Company for the construction of sidewalks and a sub-network for collecting surface water in District 4.

It is worth mentioning that in this contract, most of the executive operations were on the sidewalks and masonry that had been built before and had small problems and difficulties; It was done and the construction of new roads was not on the agenda.

Since District 4 of District 2 of Tehran leads to Hakim Highway from the north, Sheikh Fazlollah Highway from the east and south, and Yadegar Imam Highway from the west, and the area enclosed by these three highways was the scope of this contract; The operations carried out in this contract were the replacement of the tables of the Jalal Al-Ahmad highway and the repair and reconstruction of the sidewalk and the removal of the flooded side and main passages of Sattar Khan Street, and so on.

In addition, repair and reconstruction of sidewalks and flooding of side and main sidewalks of Kashanipour Street was also on the agenda, as well as repair and reconstruction of sidewalks and flooding of side and main sidewalks of Jahani Nasab Street, repair and reconstruction of sidewalks and flooding of sidewalks. And the main street of the water organization was also implemented in an acceptable way. In addition to what was mentioned, we can also mention the repair and reconstruction of sidewalks and the elimination of flooding of the main and side passages of Marzdaran Street, etc.

Because the executive operations at each of the addresses mentioned by the technical director of District 4 were brief and did not have a significant volume; Within a maximum of one to two weeks, the execution operations from start, demolition to reconstruction and delivery were completed.

However, one of the significant operations in this project was the repair and reconstruction of Alborz Street sidewalk located in Marzdaran Street. An old street that was not at all suitable for pedestrians and even pedestrians without physical problems. First, to maintain and reconstruct such a passage, the current situation was examined to design the transverse and longitudinal slope of the sidewalk. It was then decided that the old sidewalk would be completely demolished and replaced with a new sidewalk with 300-carat concrete substructure and concrete floor pavement. In addition to what was mentioned, a smoothing strip with cement sand mortar was applied to smooth the passage of the blind.

At this stage of the project, which finally lasted 10 days; The length of the sidewalk was about 100 meters and its width was about 3 meters, and about 30 cubic meters of concrete was used to implement it. Have more comfort and better quality.

Leave a comment

we keep your email protected.

comment

full name
email


  7     -   =   3  


Tadbir Poyan Asr Inc